CEM-GROUT is a non-shrink, cementitious precision grout that provides extended working time and exceptional physical performance. Cem Grout is a blend of Portland cement, graded aggregates and admixtures making is highly strong, tensile, and reliable.

Key Features

  • Excellent initial flow and flow retention High ultimate strength and low permeability
  • ensure durability of the hardened grout Suitable for pumping or pouring over a large range of application consistencies and temperatures
  • Shrinkage compensating properties
  • Good flow characteristics
  • Adjustable consistency
  • Good impact and thermal resistance
  • Non-corrosive to steel or iron

Application

  • Machine base plates/ heavy equipment
  • Bedding joints in precast concrete sections
  • Filling voids, cavities, gaps, and recesses
  • Sealing around penetrations
  • Bridge bearing pads
  • Mass grouting
  • Anchor bolt

Compressive Strength

1 day 4,000 psi ( 27.6 MPa)
7 day 8,250 psi ( 56.9 MPa)
28 day 10152 psi ( 70 MPa)

Flexural Strength

7 days 1,100 psi (7.6 MPa)
28 days 1,300 psi (9.0 MPa)

Freeze-Thaw Stability

300 cycles >99%

Splitting Tensile Strength

7 days 500 psi ( 3.4 MPa)
28 days 750 psi (5.2 MPa)

Shear Strength

28 days 2,500 psi ( 17.2 MPa)

Coverage

0.4 ft3 (0.01 m3) per bag at fluid consistency (Coverage figures do not include allowance for surface profile and porosity or material waste)

Application Steps

Mixing

  • Make sure all forming, mixing, placing, and clean-up materials are on hand.
  • Add the appropriate amount of water of clean potable water (approx. 70 °F) into a suitably sized and clean mixing container, using a calibrated measuring jug, or similar, to ensure strict control of the water content (do not over-water).
  • Add 1 bag while continuing to mix with a low-speed drill (400-600 rpm) and mixing paddle or a jiffy paddle or in an appropriate mortar mixer.
  • Once all the powder has been added, mix for approximately 3 minutes, until a lump-free and uniform consistency is achieved. Do not over mix.
  • For warmer temperatures use cold water and for colder temperatures use warm water.
  • Refer to Guidelines when there is a need to place this grout in cold & hot temperatures.

Application

  • Within 15 minutes after mixing, place grout into forms in normal manner to avoid air entrapment.
  • Vibrate, pump, or ram grout as necessary to achieve flow or compaction.
  • Mixed grout in mass will result in faster than expected setting times.
  • The product must be confined leaving minimum exposed surface.
  • After grout has achieved final set, remove forms, and shape exposed grout shoulders to designed profile.

Curing Treatment

  • Wet cure for a minimum of 3 days